Industrial Workshop Floor, Munich
Vacuum dewatering, ride-on troweling and high-gloss polishing delivered a 30 t/m² load-bearing industrial floor for a Munich manufacturing plant.
The Challenge
An industrial workshop in Munich, Germany demanded exceptional load-bearing capacity and wear resistance for heavy manufacturing equipment.
The Creare Solution
The floor was built with 2 × concrete vacuum dewatering machines to remove excess water and boost density, 6 × ride-on power trowels for large-area flatness, and 4 × high-efficiency floor polishing machines for a high-gloss finish.
Results
Equipment Used
"Density and flatness both passed third-party inspection on the first attempt. The dewatering step made a visible difference in final strength."